Skip to main content
Nucor Steel Crawfordsville, Industrial Manufacturing shrink wrapping by Shrink Masters

Industrial Manufacturing · Crawfordsville, IN

Protecting 700+ Pieces Through the Nucor Steel Expansion

Over a multi phase facility expansion, Shrink Masters shrink wrapped more than 700 pieces of equipment for Nucor, North America's largest steel manufacturer, so every motor, drive, and control panel emerged installation ready.

Nucor Steel Crawfordsville, project summary

Shrink Masters protected over 700 pieces of equipment during Nucor Steel's multi phase expansion in Crawfordsville, Indiana, from January 2025 through May 2026. Using 6, 7, and 8 mil industrial shrink wrap with custom ventilation, every motor, drive, control panel, and staged assembly emerged installation ready, zero rust, zero moisture damage, zero delays on turnover.

Client
Nucor Steel Crawfordsville
Scope
700+ pieces of equipment protected
Duration
Jan 2025, May 2026, multi phase
Materials
6, 7 & 8 mil wrap + custom ventilation
Outcome
Zero rust, zero moisture damage, zero delays
Service
On site industrial wrapping

Project Photos

Inside the Nucor Steel Crawfordsville Project

The Project

What We Did

When Nucor expanded its Crawfordsville steel facility, hundreds of pieces of high value equipment had to be staged and stored through a construction timeline that stretched across seasons. Motors, drives, control panels, structural assemblies, and process machinery all had to survive weather, dust, and long open air storage, and still be installation ready the day the crews needed them.

Shrink Masters wrapped more than 700 pieces on site across multiple phases, custom fitting 6, 7, and 8 mil industrial shrink wrap with engineered ventilation so moisture couldn't get trapped underneath. Each piece was sealed drum tight to shed rain and snow while the vents let the equipment breathe.

Every piece came out of storage the way it went in. Zero rust. Zero moisture damage. Zero delays on turnover, the equipment was ready when the installation schedule called for it. When the largest steel manufacturer in North America needs its expansion protected, this is the standard it takes.

Outcome

The Results

  • 700+ pieces of equipment protected across a multi phase build
  • 6, 7, and 8 mil industrial wrap custom fit with ventilation
  • Motors, drives, control panels, and process machinery sealed on site
  • Zero rust and zero moisture damage across the full timeline
  • Zero delays on turnover, every piece installation ready

Have a job like this?

Tell us what you need protected, we'll price it fast and come to your site. Free quotes, no runaround.